Barn DoorInstalation Manual IMPORTANT: Beforeyoubegintheinstalationofyourbarndo r,pleasereadthroughAL ofthemanufacturer’sinstructions. Failuretofolow theproperinstalationprocedurescouldresultinthedenialofwarantyclaimsforanyoperationalperformanceis ues.
100 ”
5 /
16 ”
21 5 / 8 ”
21 5 / 8 ”
21 5 / 8 ”
21 5 / 8 ”
4 ”
4 3 /
(x5)
(x5)
= Door Height
(x2)
(x1)
(x2)
8 ”
3 /
(x2)
M 8x60(x5)
ST4.2x25(x2)
(x2)
Determinethelocationonthewalfortherail,and useaLEVEL(!)tomarkandpre-drilholes.
(x1)
5 /
16 ”
(x2)
M 8x25(x5)
21 5 / 8 ” 21 5 / 8 ” 21 5 / 8 ” 21 5 / 8 ”
Preparethedo rbydrilingtheholesandataching therolersasindicated.
4 ”
4 3 /
a. Usingapencil,mark alineathecorectheight (H+1-5/8),ensuringitislevel b. Useastudfindertolocate thestudsbehindthedrywal. (NOTE:Ifyoucan otfind studswherethedrilholes wilgo,aheaderboardis recommended) c. Markandpre-drilholesin thestudsalongtheline
16 ”
5 /
Atachantijumpdiscstotopofthedo r(atleast1inch from rolers),rotatethem towardthe front ofthedo r.
Instaltherailusingthescrews,washersandspacers provided.
A.Form asonry
instalation (X5)
B.Forwood
instalation (X5)
- 2
Barn DoorInstalation Manual-2
Mounthedo rontherailandrotatetheantijumpdiscs towardthe back ofthedo r.
Instal2-pieceflo rguideflushwithedgeofdo ropening, andspacedfrom thewalsothedo rhangscorectly.
*Ifinstaling soft closehardware, itisbeterto rotate the discs beforehanging the dor.
Floorguide adjuststo the thickness ofthe door.
5 / 16 ”
Slidebothleftandrightstopstothedesiredlocationson therail,andtighteninplacewiththescrewsprovided. 8
Slidingthedo rfrom opentoclosed,positonthe stop erstoke pthedo rwithintheflo rguiderange.
Face-m ounted Rolers: •Philm ont • Royal • Slade •W aggoner • Vintage
Top-m ounted Roler: • Gage
www.glasscraft.com
Page 1 Page 2Powered by FlippingBook